My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135380
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:06 PM
Creation date
11/26/2007 3:24:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
3/27/2007
Doc Name
Bond Calculation
Section_Exhibit Name
Tab 13 Attachment 13-1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />I • <br />Scraper work team -Scraper :ICat 637G w/push-pull <br />-Push dozer:NA <br />• <br />PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />k: ''ii! L:';i j~rl . <br />Agency or organization name :CDMG <br />Task # : 042 State :Colorado PermNob # :C-1980-005 <br />Date : 12/01/2005 County : Routt Abbreviation :none <br />User : SLB Site :Seneca li Mine Filename :0005-042 <br />Permit or other job action :Technical Revision 37 <br />Task desuiption : Disfribute TSS E to Shop <br />,. „i, , <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 oerdav <br />Support equipment -Load area :'NA <br />-Dump area :.NA <br />Road maintenance -Motor grader :CAT f4H <br />-Water truck :,Water Tanker, 10,000 Gal. <br />Cost BrE <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water hock <br />Import tlata filename : scrapei2 NA NA NA grader misctruk <br />°~ Utilization-machine : 100 NA NA NA 100 100 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhipwsfthour: $76.44 NA NA NA $34.94 $56.94 <br />OperatingcosUhour: $166.38 NA NA NA $42.36 $93.74 <br />Ripper op.coshhour: NA NA NA NA $0.00 NA <br />Operator cosNhour : $32.15 NA NA NA $31.97 $21. P6 <br />Unit subtotals : $274.97 NA NA NA $109.27 $171.84 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work : $1,099.87 Support : $0.00 Maintenance : $281.11 <br />Total work team cosUhour : $1,380.99 <br />GI ,iJi. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 12,174 LCY fador : NA volume : 12,174 LCY <br />• Source of quantity fake-off :Table 13-2-6, SCC FPC TS REPL - E" <br />Source of estimated swell factor : NA <br />i ~~ , <br />/3 -/-63- <br />
The URL can be used to link to this page
Your browser does not support the video tag.