Laserfiche WebLink
HOURLY PRODUCTION <br />Hauling Capacity <br />• <br />Scraper Payload (weight) Basis <br />Material weigh <br />Material description : <br />USER-PROVIDED WEIGHT DATA <br />Rated payload <br />Payload capaGty <br />Travel time <br />Road condition description :Rutted dirt, fit0e maintenance, no water, 2" fire <br />Haul Route <br />sheet 2 of 2 <br /> <br />Scraper Bowl (volume} Basis o.) a <br />2,075 poundsJLCY Struck voume: 21.00 LCY <br /> Heaped volume : 31.00 LCY <br /> ~ Average volume : 26.00 LCY <br />75,000 pounds Adjusted capacity : 26.00 LCY `"' <br />36.14 LCY "' nw+N poducbon reflects voJUrne per saaper paa on push-pw~ nmae~s <br />Cycle Time : Condition Correctiorrs : Site attitude (ft.) : 7,500 <br /> Scraper Push dozer Source <br />Scraper boding time ' : i.00 minutes Altitude adj.: 1.000 NA (Cat NB) <br />Maneuver and spread time : 0.60 minutes Job efficienq ~ 0.830 NA (Cat HB} <br />• road 6me per s«aper pair u, post,-pun models Net correction : 0.830 NA <br />Seg. # ~ Haul distance (feet) ~ Grade (°h) RoII. res. (9'°) ~ Total res. (%) (Vebaty (fpm) Travel time (min.)" <br />i 1, 200 -2.00 5. DO 3.00 2800 0.68 <br /> <br /> <br /> <br /> <br /> <br /> <br />--1 -- <br />Haul time : 0.88 minutes <br />Retum route <br />•• travel tlme ror each segment rs ad)usted for accekrada4deceleradon. Retum time : 0.67 minutes <br />table velocities am max. attaalable per total resis>ance stwwr, rwt average <br />Total scraper team cyGe time poatl + haul + maneuver and spread + return) : 2.95 minutes <br />Unadjusted and productionthorx : 1,058.42 LCYJhour "" Adjusted for job condifiorrs : 878.48 LCYPoour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 srxaper(s) <br />Adjusted single scraper team (unit) hourly production : 878.48 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 1, 756.97 LCYlhour <br />JOB TIME AND COST <br />Fleet size : 2 Team(s) <br />Unit cast : $0.786 JLCY <br />Total job time : 13.19 Hours <br />Total job cost : $f 8,209 .- <br />/3-1-62 <br />