My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135380
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:06 PM
Creation date
11/26/2007 3:24:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
3/27/2007
Doc Name
Bond Calculation
Section_Exhibit Name
Tab 13 Attachment 13-1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODItCTtON <br />• Hauling Capacih <br />Scraper Payload (weigh <br />u <br />Material weigh <br />Material description <br />USER-PROVIDED INSIGHT DATA <br />Rated payload <br />Payoad capacity <br />Travel time : <br />Road condition description :Rutted dirt, little maintenance, no water, 2° fire penetration <br />Hmd RruAe' <br />sheet 2 of 2 <br />a3~ <br />2.075 oound5lLCY <br />75,000 pounds <br />36.14 LCY <br />icraper Bowl (volume) Basis <br />Struck voume : 21.00 LCY <br />Heaped volume : 31.00 LCY <br />Average volume : 26.00 LCY <br />Adjusted ppaaty . 26.00 LCY *'' <br />haay production refieds vopane per scraper pa'v onpush-pull nwdels <br />rcle Time : <br />C Condition Corrections : Site attitude (ft.) : 7, 500 <br />i <br /> Scraper Push dozer Source <br />Scraper loading time ' : 1.00 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job etfidency : 0.830 NA (Cat HB) <br />• loatl drne per so-aper pair on push-putt nwatls Net correction : 0.830 NA <br />Seg. # Haul dlsfarrce (feet) ~ Grade (%) Rdl. res. (%) Total res. (%) Vebaly (fpm) Travel time (mint" <br />1 2,000 -15.00 5.00 -10.00 1628 1.32 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />naulnme: tsz <br />Rofirm rrn de' <br />"travel 6me fa each segment is adjusted for accekraM1ONdeoeleraaon r<etUnl lrcrle <br />table velocities are ma:. attainable per total resistance sho'xn, rro1 average <br />Total scraper team cycle time (hart + traW + nrarteuver and spread + return) <br />Unadjusted unit producfiorrtltour : 564.58 LCY/hour "" Adjusted for yob <br />Optimal number of scrapers t~ dozer : NA Selected ratrrrber of scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted muRiple scraper team (Beet} handy production <br />• JOB TIME AND COST <br />Fleet size : 2 Team(s) <br />Unit cost : $1.324 /LCY <br />.' <br />Basis : <br />minutes <br />L.or mimes <br /> <br />5.53 miruRes <br />468.60 LCY/hour <br />4 scraperlsy <br />937.20 LCY/hour <br />1,874.41 LCYRtour <br />;i~ ., <br />Total job time : 7.03 Hours <br />Total job cost : $17,439 <br />~-~--r-- <br />/3-/- SS/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.