Laserfiche WebLink
sheet 1 of 2 <br />I CIRCES Cost Esttmattna Software <br />• SCRAPER TEAM WORK <br />i <br />~ ' '. I ~i <br />:~:.i i i E iid i'~ iiI :. ~~i <br />PROJECT IDENTIFICATION <br />Agency or organization name : CDMG <br />Task # : 035 State :Colorado <br />Date : 12/01/2005 Counly : Routt <br />User : SLB Sire :Seneca li Mine <br />Perm~ob # : C-1980-005 <br />Abbreviation :none <br />Filename :0005-035 <br />Permit or otherjob action :Technical Revision 37 <br />Task description :Distribute TSS X to Wolf Creek Pit <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Equipment Description <br />Scraper work team -Scraper ~ Cat 637G w/push-pull <br />-Push dozer:NA <br />• <br />Cost Brf <br />Support equipment -Load area iNA <br />-Dump area NA <br />Road maintenance -Motor grader ~ CAT 14H <br />-Water truck :Water Tanker, 10,000 Gal. <br />akdown : Suaper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA NA grader misctruk <br />U61¢atiort-machine : 100 NA NA NA 100 100 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour . $76.44 NA NA NA $34.94 $56.94 <br />Operating cosUhour : $166.38 NA NA NA $42.36 $93.74 <br />Ripper op. cosUhour : NA NA NA ":A $0.00 NA <br />Operator cost/hour : $32.15 NA NA NA $31.97 $21.16 <br />Unit subtotals : $274.97 NA NA NA $109.27 $171.84 <br />Number of units : 8 0 0 0 1 1 <br />Group subtotals Work : $2,199.75 Support : $0.00 Maintenance : $281.11 <br />Total work team cost/hour : $2,480.86 <br />~;; ~; <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume; 58,087 LCY factor; NA volume: 58,087 LCY <br />• Source of quanftgr take-otf :Table 13-2-6, SCC FPC "TS REPL-X" <br />Source of eslineated sweN factor :NA <br /> <br />