My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135380
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:06 PM
Creation date
11/26/2007 3:24:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
3/27/2007
Doc Name
Bond Calculation
Section_Exhibit Name
Tab 13 Attachment 13-1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />PROJECT IDENTIFICATION <br />Date: 09-Dec-2005 <br />• <br />• <br />CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORRM <br />II ~I''I li~ f ~f ' '8''i <br />Permitorjob no.: C-1980-005 <br />Site :Seneca li Mine <br />User : SLB Abbreviation : none State :Colorado <br />Task : OOc Filename : 0005-OOc County : Routt <br />Agency or organization name : CDMG <br />Permit orjob action :Technical Revision 37 <br />Task description :Reclaim surface wafer control structures, groundwater wells <br />TASK LIST (DIRECT COSTS( I <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK ~ DIRECT <br />HOURS ~ COST <br />010 -Regrade Pond 004 dozer 1 32.3 $10,280 <br />011 -Regrade Pond 008 dozer 1 40.1 $12, 757 <br />012 -Seal groundwatermonitodng wells borehole 1 160.0 $207,639 <br />020 -Regrade ditches grader 1 40.0 $4,371 <br />078 -Backrill truck wash ponds dozer 1 5.9 $1,953 <br />090 -Regrade Stock Tank 1 dozer 1 2.2 $753 <br />091 -Regrade Stock Tank 3 dozer 1 6.0 $1,988 <br />093 -Regrade Stock Tank 5 dozer 1 4.0 $1,335 <br />094 -Regrade Stock Tank 7 dozer 1 3.8 $1,286 <br />096 -Regrade Stock Tank 10 dozer 1 0.3 $100 <br />097 -Regrade Stock Tank 11 dozer 1 0.3 $131 <br />098 -Regrade Stock Tank 12 dozer 1 0.5 $184 <br />099 -Regrade Stock Tank 13 dozer 1 0.1 $50 <br />107 -Regmde Stock Tank 2 dozer 1 1.9 $643 <br />108 -Regrade Stock Tank 6 dozer 1 4.3 $1,432 <br />109 -Regrade Stock Tank 9 dozer 1 2.5 $848 <br />110 -Regrade Stock Tanks 15 and 25 dozer 1 30.0 $10,000 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 334.79 $255,750 <br />/3-/-4~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.