My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135380
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:06 PM
Creation date
11/26/2007 3:24:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
3/27/2007
Doc Name
Bond Calculation
Section_Exhibit Name
Tab 13 Attachment 13-1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />'~ ~ ~ Lii= <br />PROJECT ID ENTIFICATION <br />Task # : 032 <br />Date : 12/01J2005 <br />User: SLB <br /> <br />Agency or organization name : CDMG <br />Permit or other job action :Technical Revision 37 <br />Task description :Grade Wolf Creek downdrain area <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 60,000 <br />State :Colorado <br />County : Routt <br />Site :Seneca !i Mine <br />Basic machine :Cat D11 R - 11 SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> Utilization <br />Ownership cost/hour : $111.01 NA <br />Operating cost/hour : $188.40 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cost/hour : $31.78 NA <br />Total unit cosVhour : $331.19 Total fleet cesUhour <br /> <br />$331.19 <br />-r---- <br />i <br />Swell Loose <br />BCY factor: 1.250 volume: 75,000 LCY <br />Source of estimated volume :SCC Task WCD-1 <br />Source of estimated swell factor :SCC Task WCD-f <br />i i~ <br />HOURLY PRODUCTION Job Cond"Rion Correction Factors Source <br />Average push distance : 300 feet <br />Unadjusted howdy production : 1,000.0 LCY/trr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 20.00 % (i <br />Average site attitude : 8,300 feet <br />Material weigh : 3, 762 Ibs/LCY <br />Weight description <br />USER-PROVIDED WEIGHT DATA <br />• JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.547 /LCY <br />Horsepower: 850 <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.20 <br />Visibility ; 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 1.00 <br />Push gradient : 1.43 <br />Altitude : 0.93 <br />Material weight : 0.61 <br />Blade type : 1.00 <br />Net correction : 0.61 <br />Adjusted unit production : 605.54 LCY/hr <br />Adjusted Reef production : 805.54 LCY/hr <br />PermiVjob# : C-1981-005 <br />Abbreviation :none <br />Filename :0005-032 <br />Task WCD-1) <br />Total job time : 123.86 Hours <br />Total job cost : $41,020 <br />-~_ <br />Shift basis : 1 perday <br />Data source : (CRG) <br />/3-I-r~7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.