• <br />• <br />Surface Blasting Work conYd <br />Task # : 022 <br />sheet 2 of 2 <br />BLASTING MATERIALS QUANTITIES QUANTITY UNIT <br />Total quantity of stemming required 4.83 bit yards <br />Total quantity of explosives required 1,050 ounds <br />Total quantity of det. cord/fuseMrire required 1,480 lin. feet <br />Quantity of blasting caps used per blasthole 1 cap(s) <br />Total quantity of blasting caps required 34 caps <br />Quantity of primers used per blasthole 1 rimers) <br />Total quantity of primers required 34 primers <br />Quantity of delays used per blasthole 1 delay(s) <br />rro~l rn~anfihr of delavs required ~ 35 delays <br />HOURLY EQUIPMENT COST <br />Drilling equipment -Drill <br />- Drill pad preparation <br />Misc. drilling support equipment <br />Misc. explosives support equipment <br />Explosives delivery/prep. -Bulk truck <br />r.,.. ~.,,.a. <br />Shift basis : 1 per day Data source : (CRG data) <br />in. <br />Tmek Rr4 45K <br />Cost Breakdown : Drilling <br />Equipment Drill Pad <br />Preparation Misc. Drill Misc. Expl. <br />Support Support Explosives Delivery <br />Bulk Truck Cap Truck <br />Import data filename : drilling NA NA NA NA misctruk <br />Utilization -machine+att. no. 1 : 100 NA NA NA NA 50 <br />-ripper or attachment no. 2 : <br />Equipment ownership $/hr : NA <br />$53.37 NA <br />NA NA <br />NA NA <br />NA NA <br />NA NA <br />$12.94 <br />Machine+att. 1 operating $/hr : $71.57 NA NA NA NA $9.70 <br />2 operating $/hr : <br />Ripper or att $0.00 NA NA NA NA $0.00 <br />. <br />Operator+additional labor $/hr : <br />Unit subtotals : $19.26 <br />$144.20 NA <br />$0.00 NA <br />$0.00 NA <br />$0.00 NA <br />$0.00 $21.98 <br />$44.63 <br />Number of units : 1 C ~ 0 0 0 1 <br />Group subtotals : $144.20 $0.00 $0.00 $0.00 $0.00 $44.63 <br />I oral wont ream cgsmrour . a roo.w <br />• <br />MATERIALS COST <br /> Description Unit Unit Cost ~ Quantity Total Cost <br />Blasting agent : Bulk ANFO nom. density pound $0.191 1,049.91 $200.53 <br />Primers or boosters : Cast primer, 0.516 each $2.607 34.00 $88.64 <br />Blasting caps : on-electric cap, delay each $2.755 34.00 $93.67 <br />Det. cord, fuse or wire : Detonating cord, 15 gr/R. linear foot $0.098 1, 479.50 $144.99 <br />Delays : MS connectors each $3.894 35.00 $136.29 <br />Miscellaneous : one required - NA $0.00 0.00 $0:00 <br />Drill bits' : bit I'de = 1,750.0 linear feet $2,155.00 0.19 $418.69 <br />bit life unit =linear foot, bit mst unit =each (per bit) <br />I Otal maTenalS COST : bT,UdL.tl7 <br />L~,~!I ~ i~~'~ ~~'. i.. <br />DRILLING AND EXPLOSIVES PREPARATION TIME <br /> Job Condition Correction Factors - Site altitude : 7,500 feet <br /> Altitude adjustment : 0.95 (DMG est.) <br />Total drilling length : 340 linear feet Job effiaency factor : 0.67 (Ch. Exc. HB) <br />Unadjusted drilling rate : 82.00 feeUhour Adjusted drilling rate : 52.19 feet/hour <br />Drilling time : 6 51 hours Explosives prep time 5 96 hours <br />~ ~~~ ~ <br />~ I~ ~! i~l , ~ fl'~ ~j,,;,!~; <br />! ~~ <br />JOB TIME AND COST , Total job time : . <br />12.48 hours <br />Total unit cost : $1.253 per cu. yd. Total job cost : $2,288 <br /> <br />/3-/- 37 <br />