Laserfiche WebLink
sheet 1 of 2 <br />• <br />• <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />~; :a ! ~ r; n^ ~~ <br />PROJECT IDENTIFICATION <br />Agency or organization name : CDMG <br />Task # : 16a State :Colorado <br />Date : 12/02/2005 County :Routt <br />User : SLB Site :Seneca li Mine <br />PennNOb # : C-1980-005 <br />Abbreviation :none <br />Filename :0005-16a <br />Permit or other job action :Technical Revision 37 <br />Task description :Haul landfarm material from PeCoCo site of landFrll <br />i4~ " Ir1 ii '. t~i~i~~' i ,'~ !i~ a I- I ~ i~~'il~ i '' ~ij~ h i I it ;~`,i=~ I n: !,il ~I'~I <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Truric/loader team -Truck :ICat 769D <br />-Loader :CAT 988G <br />Support equipment -Load area :Cat D8R Series II - 8SU <br />-0ump area:NA <br />Road maintenance -Motor grader : NA <br />-Water tmdc : NA <br />Cost Breakdown : mricMader Work Tea <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : tmck2 loader dozer NA NA NA <br />Utilization-machine : 100 31 100 NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Camership cosUhour: $47.51 $49.01 $42.78 NA NA NA <br />Operating cesUhour : 554.21 $20.74 $66.09 NA NA NA <br />Ripper op. cost/hour : NA NA 50.00 NA NA NA <br />Operator cosUhour : 521.75 $31.97 531.78 NA NA NA <br />Unit subtotals : $123.47 $101.72 5140.66 NA NA NA <br />Number of un'ds : 4 1 1 0 0 0 <br />Group subtotals: Work: $595.59 Support: $140.66 Maintenance: $0.00 <br />Total work team cost/hour : $736.25 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 250 LCY factor : NA volume : 250 <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY <br />T <br />~; I', :r: <br />Source of quantity take-off ~ Half of volume from SCC task LANDFARM-7 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weigh) Basis <br />Material weight <br />Desu.:Earth-Wet excavated <br />Rated paybad <br />Payload cepadty <br />Total cost : $0 <br />! ` 'i l II!I i ~~II <br />Truck Bed (voume) Basis <br />2, 700 poundslLCY Struck volume : 21.60 LCY <br /> Heaped volume : 31.70 LCY <br />82,000 pounds Average volume : 26.65 LCY <br />30.37 LCY Adjusted volume': 30.37 LCY <br />Final truck volume based on number of Bader passes : 27.06 LCY <br />`trutlr voluore adjustetl 1o rKK exceed rated PeY~oad or IreapeC vdune <br />Loading Tool Capacity : ob Condition Corrections : Site altitude (ft.) : 7,500 <br />Rated capaaty (nom. heaped) : 8.200 LCY Truck Loader Source <br />Desa.:Other - rock/dirt mixtures (100.120%) Akitude adj.: 1.000 1.000 (Cat HB) <br />• <br />Bucket fill factor : 1.100 Job efficienq : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity : 9.020 LCY Net wrrection : 0.830 0.830 <br /> <br />LCY <br />/3-/-29 <br />