My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135380
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:06 PM
Creation date
11/26/2007 3:24:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
3/27/2007
Doc Name
Bond Calculation
Section_Exhibit Name
Tab 13 Attachment 13-1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />• BULLDOZER WORK <br /> PROJECT IDENTIFICATION <br /> Task # : 009 State :Colorado Permif(ob# : C-1980-005 <br /> Date : f 1/30/2005 County : Routt Abbreviation : none <br /> User : SLB Site :Seneca li Mine Filename : 0005-009 <br /> <br /> Agency or organization name : CDMG <br /> Permit or other job action :Technical Revision 37 <br /> Task description : Regrade deadhead routes (SCC Task DH-1) <br /> <br /> HOURLY EpUIPMENT COST <br /> Basic machine :CatD11R-11SU Horsepower: 850 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown : Ownership cost/hour : $97.60 NA <br /> Operatingcost/hour : $188.40 100 <br /> Ripper op. costiriour : $0.00 NA <br /> Operator cosOhour : $31.78 NA <br /> Total unit cosUhour : $317.79 Total fleet cosUhour : $317.79 <br /> ~~- <br />• MATERIAL QUANTITIES <br /> Initial Swell Loose <br /> volume : 44,444 LCY factor : NA volume : 44,444 LCY <br /> <br /> Source of estimated volume :SCC Task DH-1, upper 1' of material <br /> Source of estimated swell factor : NA <br /> <br />'~ ;- <br />i !'-' I ~i~ ~ i <br />i ~' i ~ <br />~~ ~~ri <br /> HOURLY PRODUCTION Job Conditron Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br /> Average push distance : 75 feet Material consistency : 1.00 (Cat HB) <br /> Unadjusted hourly production : 3,545.9 LCY/hr Doting method : 1.00 (gen.) <br /> ~lsibilily : 1.00 (avg.) <br /> Material consistency description : Job efficiency : 0.83 (1 shiti/day) <br /> Consolidated stockpile Spoil pile : 1.00 (use0 <br /> Push gradient : 1.00 (Cat HB) <br /> Average push gradient : 0.00 % (pos) Attitude : 1.00 (Cat HB) <br /> Average site aRitude : 7,100 feet Material weight : 1.03 (user) <br /> Blade type : 1.00 (S/SU/U) <br /> Material weight : 2,238 Ibs/LCY Net cerzection : 0.64 <br />Weight description <br />USER-PROVIDED WEIGHT DATA <br />• JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.740 /LCY <br />Adjusted unit production <br />Adjusted fleet producton <br />Total job time <br />Total job cost <br />2267.65 LCY/hr <br />2,267.65 LCY/hr <br />19.80 Hours <br />$6,228 <br />,,T <br />/3-/-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.