Laserfiche WebLink
CIRCES Cost Estimating Software <br />• BULLDOZER WORK <br /> PROJECT IDENTIFICATION <br /> Task # : 009 State :Colorado Permif(ob# : C-1980-005 <br /> Date : f 1/30/2005 County : Routt Abbreviation : none <br /> User : SLB Site :Seneca li Mine Filename : 0005-009 <br /> <br /> Agency or organization name : CDMG <br /> Permit or other job action :Technical Revision 37 <br /> Task description : Regrade deadhead routes (SCC Task DH-1) <br /> <br /> HOURLY EpUIPMENT COST <br /> Basic machine :CatD11R-11SU Horsepower: 850 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown : Ownership cost/hour : $97.60 NA <br /> Operatingcost/hour : $188.40 100 <br /> Ripper op. costiriour : $0.00 NA <br /> Operator cosOhour : $31.78 NA <br /> Total unit cosUhour : $317.79 Total fleet cosUhour : $317.79 <br /> ~~- <br />• MATERIAL QUANTITIES <br /> Initial Swell Loose <br /> volume : 44,444 LCY factor : NA volume : 44,444 LCY <br /> <br /> Source of estimated volume :SCC Task DH-1, upper 1' of material <br /> Source of estimated swell factor : NA <br /> <br />'~ ;- <br />i !'-' I ~i~ ~ i <br />i ~' i ~ <br />~~ ~~ri <br /> HOURLY PRODUCTION Job Conditron Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br /> Average push distance : 75 feet Material consistency : 1.00 (Cat HB) <br /> Unadjusted hourly production : 3,545.9 LCY/hr Doting method : 1.00 (gen.) <br /> ~lsibilily : 1.00 (avg.) <br /> Material consistency description : Job efficiency : 0.83 (1 shiti/day) <br /> Consolidated stockpile Spoil pile : 1.00 (use0 <br /> Push gradient : 1.00 (Cat HB) <br /> Average push gradient : 0.00 % (pos) Attitude : 1.00 (Cat HB) <br /> Average site aRitude : 7,100 feet Material weight : 1.03 (user) <br /> Blade type : 1.00 (S/SU/U) <br /> Material weight : 2,238 Ibs/LCY Net cerzection : 0.64 <br />Weight description <br />USER-PROVIDED WEIGHT DATA <br />• JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.740 /LCY <br />Adjusted unit production <br />Adjusted fleet producton <br />Total job time <br />Total job cost <br />2267.65 LCY/hr <br />2,267.65 LCY/hr <br />19.80 Hours <br />$6,228 <br />,,T <br />/3-/-20 <br />