Laserfiche WebLink
CIRCES Cost Estimating Software <br />• DIRECT COST SUMMARY FORM <br />• <br />• <br />PROJECT IDENTIFICATION <br />Date : 15-Dec-2005 <br />User <br />Task <br />SLB <br />Permit or job no. <br />Abbreviation <br />C-1980-005 <br />none <br />OOh Filename :_ <br />Agency or organization name : CDMG <br />Permit orjob action :Technical Revision 37 <br />Task description :Topsoil disturbed areas <br />TASK LIST (DIRECT COSTSI <br />NO. TASK DESCRIPTION ~ FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />~ COST <br />034 -TSS A to Shop scraped 1 4.3 $5,972 <br />035 -TSS X to Wolf Creek scraped 1 34.4 $85, 348 <br />036 -TSS X to Road F scraped 1 7.0 $17,439 <br />037 -TSS T to Wolf Creek scrapert 1 19.01 $47,159 <br />038 -TSS 00 to Wolf Craek scraped 1 23.6 $32, 638 <br />039 -TSS 88 to area ahead of pits scraped 1 78.21 $108,008 <br />040 -TSS AA to area ahead of pits scraped 1 13.1 $18,209 <br />041 -TSS AA to Wolf Creek Pit scraped 1 6.51 $8,997 <br />042 -TSS E to Shop scraped 1 26.1 $36,105 <br />043 -TSS E to Haut Road E scraped 1 1.5 $2,107 <br />044 -TSS O to Lower Wolf Creek scraped 1 89.9 $124,259 <br />045 -TSS O to Haul Road F scraped 1 10.4 $14,430 <br />046 -TSS LL to Wadge Pit scraped 1 77.61 $107,179 <br />047 -TSS LL to area ahead of Wadge scraped 1 42.0 $58,113 <br />048 -TSS 11 to Wadge between ElA and E5A scraped 1 4.8 $6,643 <br />049 -TSS 11 to Road E5 scraped 1 29.9 $41,374 <br />050 -TSS II to Road E5 scraped 1 66.61 $91,983 <br />051 -TSS P to landfill scraped 1 10.2 $14,209 <br />052 -TSS P to Road El scraped i 0.3 $520 <br />053 -TSS NN to area ahead of Wadge scraped 1 341.3 $471,454 <br />054 -TSS KK fo area around KK scraped 1 5.6 $7, 727 <br />O5~ -TSS KK to Cow Camp scraped 1 f0.5 $14,630 <br />056 -TSS HH to Cow Camp scraped 1 72.0 $99,508 <br />057 -TSS HH to Highline Road scraped 1 28.2 $39,057 <br />058 -TSS HH to Pond 004 scraped i 11.7 $16,151 <br />059 -TSS HH to Road ElA scraped 1 72.2 $99,807 <br />060 -TSS HH to Wadge between E5A and ElA scraped 1 41.4 $57,256 <br />075 -Deadhead routes scraped 1 33.1 $45,787 <br />080 -Access roads dozer 1 298.8 $42,040 <br />112 -Previouslyrec/aimedareas scraped 1 2,361.01 $1,298,407 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 3,822. $3,012,516 <br />0005-OOh <br />Site :Seneca li Mine <br />State :Colorado <br />County : Routt <br />i3~/- 9 <br />