Laserfiche WebLink
~NITE~i <br />~~~~ UNITED POII <br />i?O. [irnc 829. Bi <br />Far 307-fi5Si-17 <br />October l3, 1999 <br />Ms. Lyon Mayer <br />L.G. Everist, Inc. <br />7321 F.- 88"' Avenue, Suite Z00 <br />Iieaderson, LO 80640 <br />Re: Pt. Lupton Prvpcrty <br />Deaz Ms. Mayer; <br /> <br />303-659-055t • 1.000-s68-8809 <br />• hrtp:1/www.unitetlpower.wrn <br />Thank you for the detailed information cnnceming the electric load at the future Ft. Lupton plant. <br />Tn regard to the provision of electric service, the batch plant and crusher plant could be on the <br />same transformer, if they aze silualed in. close proximity to each other. Your electrical planner <br />should decide the feasibility of oac transformer for bath or one for each. They would <br />presumably each have choir own meter and main disconnect. <br />In regard to the line relocatioq your planners should propose the new route. After that, we can <br />meet oa the site and walk the realignmrnt. <br />I will reserve the cost estimates for cacti of the plants and the rcali~tmeat until we have reached <br />more certain plans. As soon as you havo those plans, give me a call :rod we will meet on the site. <br />l look forward to working with you <br />Sincerely, <br />U 'CED POWk;R, INC. <br />Bill Meier <br />I-25 District Rcprescntative <br />BM:vm <br />..._ - ~•r~~~ <br />~~~ <br />_._ ~ iil <br />i~ <br />A Trnichscouc knarry"` Parrn.v 7~ng1 <br />