Laserfiche WebLink
L.G. EVERIST, INC. <br />December 3, 1999 <br />Howard (Corky) Cantrell <br />Lupton Bottom Ditch Company <br />P.O. Box 305 <br />Fort Luplon, CO 80621 <br />Dear Corky: <br />~. <br />CORPORATE OFFICE <br />300 S. PNILUPS AVE • SURE 200 <br />P.o. t3ox saxB <br />SIOU% FALLS, SD 37177.58?] <br />PHONE 805334-5000 <br />FAX 8053343fgB <br />rc <br />"m MOUNTAIN DIVISION <br />7321 E. 88TH AVENUE• SUITE 200 <br />RENDER" N, CALORAOO e0B~0 <br />303.287-8606 <br />FA%303.2BB-1348 <br />Enclosed is a scaled drawing of the proposed changes to the section of the Lupton Bottom <br />Ditch, which traverses L.G. Everist, Inc.'s property located north of Ft. Lupton. The.drawing <br />details the dimensions and material composition of the reconstructed ditch, as weft as the <br />temporary relocation during mining. <br />As we discussed, sections of the Lupton Bottom ditch will be mined during the dry season, <br />September to March, and reconstructed during the next season, so as to not disturb water flow. <br />We propose mining and reconstructing the south half of the Ditch during Phase 1, and the north <br />half between Phases 3 and 4. <br />Please acl <br />below and <br />If <br />your understanding and acceptance of our proposal by countersigning <br />a signed copy to me. Thank you. <br />please call me directly. <br />4 <br />~~ ~ <br />President <br />enclosure <br />Acknowledged by: <br />Howard (Corky) Cantrell <br />Lupton Bottom Ditch Company <br />Dale <br />LM1FL•Ibtl it chco-120199 <br />