Laserfiche WebLink
<br />c: <br />ACA may store equipment fa the mitring and related concrete and asphalt plant operations, <br />which may indude parts and storage vans, pipe, water and fuel tanks, and plant support <br />• structures. Also related mobile equipmert may be temporarily located on the site inducting <br />concrete mixer trucks, dump trucks, loaders, dozers, and scrapers. <br />The gravel wash plait includes two settling ponds and one fresh water pond for washing <br />operations located on the north central portion of the mining area. The ponds cover <br />approximately 2 acres. The ponds are maintained as necessary for the removal of fine sediments <br />from the wash circuits. No dispersants, flocculent or other chemical are used in the wash circuit. <br />Fines removed from the ponds may be used for planting medium in the reclamation activities. <br />TIME TABLE FOR MINING OPERATIONS <br />1998 2010 2030 2070 <br />PHASEI <br />PHASE II <br />PHASE III <br />` NOTE `The timetable is only an estimate. Actual completion will vary depending on market <br />demands. <br />• <br />"r <br /> <br />