Laserfiche WebLink
® • <br />EXHIBIT L <br /> nr[ Sall 121 P` <br />~ 1 ~~ ~~ .,~"I <br />~ <br />~ ~ ` <br />Topsoil Replacement 50.50/ C.Y. 10,245 C.Y. (5125.00 ~~ <br />Seed Costs (53.21 /AC 12.7 AC f 676.00 f t <br />Labor cost for seeding i 50.00/AC 12.7 AC f 635.00 , <br /> <br />Fertilizer <br />(40.00/AC <br />12.7 AC <br />1508.00 ,, <br />~ <br />trees f5o.oo/r~A 301iA s15oo.00 ~'` <br />II (( <br />yl .IU.~ 6r ~41'f(IN~4Y 5~1C ff'f ~~l <br />1 ~,,...,..f. I/. <br />~~~WD: ~ll..d <br />J <br />~ <br />, <br />~ f. ~~, . I Total Reclamation Costs (8,444.00 ;es <br />, <br />, <br />, <br />Notes: .«,if.,f~<•f„1- ~S~7a~ tiaras ~ (c~4.~//~ ~ iz,~o <br /> <br />Topsoil replacemeni costs include haul and placement of topsoll is areas to <br />be reclaimed. Also included are costs to place and grade material in order to <br />produce irregular shorelines around ponds. This cost may appear low, but is <br />based on our machine rates and antiapated time to complete the work as the <br />topsoil will be available on site and the haul distances will be short. <br />Seed cost is based oa doubling the application rate shown in lithibit Ii <br />Labor cost of seeding includes seedbed preparation and the seeding <br />operation. <br />Fertilizer cost includes fertilizer and application. <br />Tree coat includes material and labor. <br />Revised 10/l0/86 <br />(,-~2," ~i~pRt~ ~e~ 3o.Kflz,l=y3,1 gfvcs <br />3~~~3~ cwyAs <br />~~„~ 1,,.,,o=tQ ~r vc~uututuF rtn I~.•~ ucv[1. <br />n, 1`1~~ ~F 4V ~_f <br />