My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135185
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:55 PM
Creation date
11/26/2007 3:10:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 14 MINE PLAN PERMIT REVISION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 11/85 <br />• 2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND <br />MINING ACTIVITIES -- MINIMUM REQUIREMENTS FOR <br />OPERATION AND RECLAMATION PLANS <br />2.05.1 Objectives <br />The objectives of this Section are to ensure that the Division is <br />provided with comprehensive and reliable information on the planned <br />surface and coal mining operations, and to ensure that those operations <br />will be allowed to be conducted in compliance with the Colorado Rules <br />and Colorado Surface Coal Mining Reclamation Act, Article 33 of Title <br />34, as amended, Colorado Revised Statutes of 1973. <br />2.05.2 Operation Plan - Estimated Area for Life of Operation <br />The Bear Coal Company plans to permit the area for the first five years <br />of operations. Planned underground mining in the C Coal Seam will <br />involve approximately fifteen years of mining at the anticipated annual <br />average production rate of 275,000 tons of coal per year. For purposes <br />of this application, although the Bear Coal Company is only requesting <br />to revise the current five year permit term, the mining and reclamation <br />plan identifies all mining within the C Coal Seam. The Bear Coal <br />Company will submit information regarding the mining of the B, E, and F <br />Coal Seams with future 5-year permits. Details of the operational plan <br />for the C Coal Seam are delineated in Section 2.05.3. <br />The Bear Coal Company will employ detailed and current engineering <br />design for all underground mining activities in order to maximize <br />recovery. Methods of coal recovery are set forth in Section 2.05.3. <br />Plans for mining additional coal in the permit area via underground <br />techniques have not been finalized, but regardless, the mining of other <br />seams is not anticipated within the first five years of mining. <br />Detailed mining plans for recovery of additional coal will be submitted <br />as appropriate or required. <br />-11- <br />
The URL can be used to link to this page
Your browser does not support the video tag.