Laserfiche WebLink
-T_tem L}- <br />A <br />Di <br />i <br />f~ <br />d <br />1 <br />00' <br />12' <br />f <br />i <br />ti <br />d <br /> . mens <br />ons o <br />s <br />oa <br />: <br />5 <br />x. <br />o <br />ex <br />ng roa <br />, <br /> B, Improvements: Half of existing road is graveled- he other half <br /> Trill be graveled as soon as we get hte permit of <br /> A;ined Land Reclamation, <br /> C, Road: The existing road is included in acreage o~ ' S,q <br /> D, See Exhibit E, <br /> E, There e.211 be no processing on the Site, Juut lo~ding of truck::, <br />Item 5- <br /> A, Animas River Channel: Fle vall not be mining in t e water, only <br /> a sand bar above for water line and in a <br /> westerly direction x2th a lone grade of 25'- <br /> B, Later Quality and Aquatic Habitats: Since we are not vrorking in <br /> the stream b d, disturbances <br /> are minimal, <br /> C, Di}:e s: Atone <br /> D, Settling Ponds: IQone <br /> E. Low 4~ater Times: Ido mining va 11 be done until th river has gone <br /> dorm considerably, Late July or early August, <br /> F, Equipment: Storage x,211 be out of the Pit area, <br /> G, Site: The Permited area call be kept clean, A;o c s, Barrels, etc. <br />li.'~II EI T D <br />Item 1- In the fifteen years I have ti:•orked a Sand bar sim lax to this one <br /> I have not had any trouble rith any of the concer s in this paragrap <br />Item 2- Grass Seeding: Seeding grill be done to match the native grasses: <br /> after operations cease, <br />Item 3- Slopes: lVe x.211 have slopes no greater than 4 ~~ 1, <br />Item 4- Reclamation: The land call be returned to it's n tural state, <br />Item 5- Posoibilities: l7e Trill be mining a sand bar abou 12 acres <br /> in size and disturbing very littl of the river <br /> banl; for access to the sand bar, `!+e vrill return <br /> it to it's natural elevation v.~hen mining operation <br /> is terminated, i <br />Si n <br />/ [, <br />J n Dillon <br />JD/cd <br />