Laserfiche WebLink
-3- <br />detemvned: <br />b) The Board will enter the lands to perform reclamation only if the Board has <br />i. that reclamation required by iaw to have been performed upon such lands has <br />not been performed, and <br />ii. that financial warranty forfeiture proceedings described in the Act or similar <br />provisions of subsequent laws, if any, have been initiated. <br />c) The Division, acting for the Board, will enter ]ands to respond to an emergency only <br />where the Division detemrirres that any of the conditions of Construction Material Rule 8.4.2. exist. <br />7) The additional conditions set forth in the attached rider, if any, are incorporated herein by <br />reference. <br />/_ / a) Rider is attached. <br />/_X~J b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DE~PA~RTME~NT O/~F NA~TU-RAL RESOURCES <br />RONALD W. CATTANY ` <br />Division Director <br />