My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135058
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:47 PM
Creation date
11/26/2007 3:03:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
ROCK CHECK DAM DESIGN
Section_Exhibit Name
TAB 13 APPENDIX 13-8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introduction <br />Peabody has constructed rock check dams in reclaimed drainage channels <br />to successfully control erosion and head cutting. Peabody will continue <br />to utilize rock check dams to control and prevent erosion in drainage <br />channels. The existing rock check dams (No. 1 to No. 6 and No. 15) were <br />evaluated and the proposed rock check dams (No. 7 to No. 14) were <br />designed to be stable and handle the design flow. <br />Desi n <br />All check dams will be designed, constructed, and maintained to safely <br />pass the 100-year, 24-hour storm. The peak runoff from the design storm <br />was determined by use of the SEDCAD+ computer model. <br />It was assumed that the rock check dams would act as a short section of <br />riprap channel and SEDCAD+ was used to determine and size the rock in <br />the existing and proposed check dams. Addendums 1 and 2 contain the <br />SEDCAG+ outputs for check dams No. 1 to No. 6 and No. 15, and No. 7 to <br />No. 14, respectively. <br />Check Dams <br />The location of the existing check dams No. 1 to No. 6 in the reclaimed <br />drainage channel above Pond 004 are depicted on Exhibit 7-7. Figure <br />13-8-1 shows the cross section of these rock check dams.l Listed below <br />is a summary of the specifications of check dams No. 1 to No. 6 and No. <br />15. <br /> <br />13-8-1 Revised 07/24/90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.