Laserfiche WebLink
<br />6. What is the name of the .9 cfs water right relied upon by Andesite <br />for its water supply? <br />7. For the water right named in Question 6, state: <br />a. The court and adjudication date of the right. <br />b. The name and the decreed point of diversion of the water right. <br />8. State the name and adjudication date of each water right on the <br />South St. Vrain Creek (a.k.a. the South St. Vrain River) which is owned by <br />Andesite. <br />9. State the name and adjudication date of each water right on or <br />tributary to the South St. Vrain Creek which Andesite has the right to use for <br />mining purposes. <br />10. State the name, use and adjudication date of each water right on or <br />tributary to the South St. Vrain Creek which Andesite has the right to use for <br />any purpose. <br />11. Does Andesite intend to acquire any water rights on or tributary to <br />the South St. Vrain Creek? <br />12. If the answer to Question 11 is affirmative, state the name, use, <br />decreed point of diversion, amount of diversion and adjudication date of each <br />water right to be acquired. <br />13. Has Andesite conducted any mining operations (as defined in <br />34-32-103(8)) outside of the 27-acre area permitted by the Mined Land <br />Reclamation Board? <br />14. If the answer to question 13 is affirmative, state the location and <br />type of each operation conducted outside of the 27-acre permitted area. <br />15. Does Andesite presently plan to reclaim all areas within the <br />proposed permit area which are designated as Niwot soil, as hay meadow? <br />16. If the answer to question 15 is negative in whole or in part, state <br />the facts upon which Andesite believes such reclamation is not required. <br />17. Does Andesite intend to construct any new roads on the proposed <br />permit area? <br />If so, state: <br />a. The location of each new road. <br />b. Whether Landowner's consent has been obtained for such <br />construction. <br />-2- <br />