Laserfiche WebLink
Rule 3: Pcxlorntance l3oud RecLrcments <br />3.02.3 Period of Liability fur Performance Bond <br />LCC will post a surety bond for the duration of the coal mining and reclamation <br />operations and fox a 10-year period following reclamation. <br />3.(12.4 Form, Conditions, and Terms of Pcrforrnancc 13uuds <br />LCC will post a surety bond prior to permit issuance which will comply with the <br />conditions and leans of this rule. <br />• <br />• <br />7R- l3 3-2 (I -7-I)5) <br />