Laserfiche WebLink
APPENDIX 2.05.4-1 (Continued) <br />• <br />• <br />Cost Breakdown• <br />Earthwork/Grading/Scarification: <br />Yampa River coal loadout 80 yds @ E 3.00 E 2,400.00 <br />Explosive storage area 300 yds @ E 3.00 900.00 <br />Abandoned access road 625 yds @ E 1.50 937.50 <br />Access roads 1,100 yds @ E 1.00 1,100.00 <br />Berms haul road 9,500 yds @ S 1.50 15,867.50 <br />Yampa sedimentation pond 3,000 yds @ E 2.50 7,500.00 <br />Sedimentation backfill 9,000 yds @ S 1.50 13,500.00 <br />Culvert No. 1 stabilization 2,500 yds @ E 3.00 7,500.00 <br />Gravel removal 1,360.00 <br />Berm removal east of crusher 1,035.00 <br />Subtotal 52,100.00 <br />Topsoil: <br />Yampa River new sediment 5 yds @ E 4.00 E 20.00 <br />Explosive/traps 75 yds @ E 5.00 375.00 <br />Sediment Ponds #1 and #2 2 yds @ E20.00 40.00 <br />Abandoned access road 300 yds @ E 5.00 1,500.00 <br />Haul road berms 3,000 yds @ E 2.00 6,000.00 <br />lower sediment pond 3,000 yds @ E 3.00 9,000.00 <br />Stabilize below #1 250 yds @ S 5.00 1,250.00 <br />Backfill sediment pond 350 yds @ E 3.50 1,050.00 <br />Scoria pit 120.00 <br />Subtotal <br />19,355.00 <br />Riprap: <br />Yampa sediment <br />Sediment traps <br />NW sediment trap <br />Impoundment #1 and #2 <br />Runouts #2 and #4 <br />Explosive storage <br />Haul road ditches <br />Yampa River below #1 <br />Haul road runout <br />Explosive sediment <br />Below #1 <br />Quarry <br />Riprap ditch 1981 reclamation <br />Culvert installation NW sediment <br />2 yds @ 540.00 E 80.00 <br />95 yds @ E20.00 1,900.00 <br />6 yds @ E40.00 240.00 <br />65 yds @ E25.00 2,105.00 <br />10 yds @ E10.00 100.00 <br />50 yds @ E25.00 1,250.00 <br />200 yds @ E25.00 5,000.00 <br />75 yds @ 525.00 1,815.00 <br />300 yds @ E30.00 9,000.00 <br />50 yds @ 520.00 1,000.00 <br /> 349.00 <br /> 862.50 <br /> 220.00 <br /> 417.00 <br />• Subtotal 24,398.50 <br />- 369 - (Rev. 5/861 <br />