Laserfiche WebLink
APPENDIX 2.05.4-6 (Continued) <br /> <br /> 3. 0/B Scarification - 5-6 ac. to be scarified <br /> a. Equipment - CAT 130G motor grader <br /> b. Production - 4 ac/h r. <br /> c. Time - 5-6 ac./4 ac./h r. = 1.5 hr. <br /> d. Cost - 5119.18/hr. x 1.5 hr. = 178.77 <br /> 4. Topsoiling - Assume 1,428 BCY to be replaced <br /> a. Equipment - Cat 657 B grader <br /> b. Production - 282 BCY /h r. <br /> c. Time - 5.0 hr. <br /> d. Cost - E308.33 x 5 hr. = 1,561.00 <br /> 5. Fertilization - E38.20/ac. x 5.5 ac. 210.00 <br /> 6. Seedbed Preparation - E24/ac. x 5.5 ac. = 137.00 <br /> 7. Seeding - Broadcast 51,742/ x 5 ac. = <br />~~ 87.00 <br /> f = <br />Mix E562.20 9,288.00 <br /> 8. Mulch - 5 ac x 5160/ac. = E900.00 <br />• b32 x 5.5 ac. = 176.00 1,076.00 <br /> 9. Fencing - 3,200' @ E2.25/ft. = 7,200.00 <br /> Tot al North of Yampa E 74,779.77 <br /> <br /> - 366 - (Rev. 5/861 <br />