My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134871
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:35 PM
Creation date
11/26/2007 2:50:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
DRY CREEK UNDERGROUND EXPLORATION PLAN
Section_Exhibit Name
TAB 12 ATTACHMENT 12-1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• drill pad will also be constructed at this Location. <br />Total footage to be drilled for all three holes is 1095 feet. Hole diameter will equal SK <br />to 6 inches. <br />Seismic Investigation <br />Three seismic lines will traverse the permit area. Total length of the lines, within the <br />permit area, are 12,600 ft. Holes for the seismic charges will be hand (powered) angered <br />(1-2 inch diameter) to a depth of 5 ft. each. The holes will be on 50 ft. centers for e <br />total number of holes equaling 229. Maximum explosive per hole is 1/3 pound. Brushing of <br />the 5-foot wide lines will be accomplished by hand. <br />Seismic blasting operations will not be conducted within 7,000 feet of any building, or <br />500 feet of an active or abandoned underground mine. A Special Use Permit for seismic <br />testing end blasting will be obtained from the Routt County Clerk's office prior to <br />exploration. All local, Stet e, and Federal regulations will be strictly adhered to during <br />this project. <br />• Reclamation Costs <br />Upon completion of the drilling project, all areas will be reclaimed with the exception of <br />the monitoring well and access to the well which will be reclaimed et a later date. Upon <br />final abandonment of the monitor well with grout end the pl atement of the cement plug, the <br />PVC casing will be cut off at three feet below ground surface, with the remaining three <br />feet of hole bac kfilled with topsoil, compacted, and seeded. Drill holes will be plugged <br />in accordance with methods described in Tab 78. All areas will be retopsoiled by pushing <br />the topsoil back over the disturbed area. This includes the roads and drill pads. The <br />areas will then be revegetated with the seed mix shown on page 72-1-5. <br />The seismic line holes will be reclaimed by placing cuttings into the holes. Any area <br />that had been brushed by hand will not be planted due to natural reinvasion of brush. <br />Estimated Reclamation Costs <br />1. Seismic Costs <br />1. Direct Costs (bac kfill with cuttings) <br />• A. Labor S25/hour <br />B. 20 holes/hour <br />12-t-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.