Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />EXHIBIT L <br />RECLAMATION CDSTS <br />Reclamation costs include: <br />$ .80/yd. moving of topsoil. <br />.80/yd. sloping of cut banks. <br />$3D0.00/acre seed mix, fertilizer, etc. <br />Cost to move 9.9 ac.-feet of topsoil <br />Cost to move approximately 46,660 yards <br />of bank - sloping material in areas <br />A, C, D, E, and F. <br />Cost to seed, fertilize, till, etc. <br />approximately 40 acres ~ $300/acre <br />Average cost of reclamation per acre <br />16 <br />$ 12,777.60 <br />$ 37,333.33 <br />$ 12,000.00 <br />62,110.93 <br />$ 1,552.77 <br />