My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134846
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134846
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:33 PM
Creation date
11/26/2007 2:47:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977306
IBM Index Class Name
Permit File
Doc Date
7/14/1999
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Colorado Division of Minerals and Geology <br /> ESTIMATING FORM <br />________________ - STRUCTURAL DEMOLITION 40RK <br />____________________________ <br />Task No.: 1 Prepared by 4HE <br />Permit No.: M-77-306 Fi Lename N306-1 <br />Date 14-Jul-99 Operation Jd-9 Mine <br />Permitting action General 112 bond review <br />DIMENSIONS I COMPOSITION I QUANTITY I UNIT <br />Task description Demolish and remove all mining structures and debris <br />MEANS Location Adjustment: 107.20% of base unit costs - MEANS SITE 40RK 8 LANDSCAPE COST DATA 1997 Edi [ion <br />STRUCTURE / FACILITY / EOUI PMENT DESCRIPTION <br />Shop Building <br />Concrete pad for Shop Building <br />Concrete pad for vent hole <br />Concrete pad for vent hole <br />Concrete pad for vent hole <br />Powerline, single woad pole <br />Electric Transformers <br />Chainlink fence for substation <br />Concrete pad for substation <br />Water treatment shed <br />Water treatment shed <br />Hazardous Naste - pond sludge pickup with <br />vacuume truck (minimum charge 4 hours) <br />Hazardous waste transport to Canyon City <br />Misc debris <br />~ 72'L * 40'4 * 12'H ~ Metal ~ 34,560 ~ cu.ft. <br />72'L * 40'4 * .5'thick ~ Concrete ~ 53 ~ cu.yd. <br />16'di ameter * 2'thick ~ Concrete ~ 15 ~ cu.yd. <br />16'diameter * 2'thick ~ Concrete ~ 15 ~ cu.yd. <br />16'diameter * 2'thick ~ Concrete ~ 15 ~ cu. yd. <br />500'L powerli ne ~ Powerline ~ 500 ~ In.ft. <br />~ 6 transformers ~ ~ PCB ~ 1,800 ~ pounds <br />20'L * 10'4 * 8'H ~ Choi mink ~ 60 ~ ln.ft. <br />20'L * 10'4 • .5'[hick Concrete ~ 4 ~ cu.yd. <br />10'L * 10'4 • 8'H flood ~ 800 ~ cu.ft. <br />MEANS BASE ADJUSTED <br />UN[T COST TOTAL LOST <br />50.19 <br />52.29 <br />52.29 <br />52.29 <br />57,039 <br />5131 <br />537 <br />537 <br />52.29 <br />51.95 <br />50.69 <br />51.71 <br />52.29 <br />sheet 1 of 2 <br />537 <br />E1, 045 <br />51,331 <br />5110 <br />E9 <br />50.19 I 5163 <br />10'L • 10'N * 8'H ~ flood ~ 800 ~ cu.ft. ~ 50.19 <br />vacuume truck a 8 hour ~ pond sludge ~ 8 ~ hours ~ 5100.00 <br />vacuume truck ~ pond sludge ~ 350 ~ miles ~ 54.40 <br />20'L * 10'4 • 10'H ~ debris ~ 2,000 ~ cu.f t. ~ 50.22 <br />5163 <br />5858 <br />51,651 <br />5472 <br />TASK SUBTOTAL - sheet 1 513,082 <br />
The URL can be used to link to this page
Your browser does not support the video tag.