Laserfiche WebLink
<br />RECLAMATION LOST SUMMARY cont'd sheet 3 of 4 <br />H. EART HUORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (S) <br />NA ~ Not indicated in reclamation plan <br />Subtotal (H): <br />____________ <br />1. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (S) <br />NA ~ Accomplished under task 3 8 4 <br />Subtotal (1 ): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No-~ Task Description ~ Cost (S) <br />__________________________________________________________I___________. <br />5 ~ Replace topsoil (waste rock fines) ~ 5813 <br />0.5' depth over 3 acres. <br />Subtotal (J): S81i <br />