My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134846
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134846
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:33 PM
Creation date
11/26/2007 2:47:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977306
IBM Index Class Name
Permit File
Doc Date
7/14/1999
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DOZER COST 8 PERFORMANCE DATA 1JORKSHEET <br />Hachine Make B Hodel: Cat DBN <br />Dozer Blade: EEMI-UNIVERSAL <br />Attachment kt: ROPE Cab <br />Attachment k2: 3-shank ripper <br />Last Cost Revision: April, 1997 <br />80.5E EQUIPMENT COETE (CRG) <br /> <br />COLORADO DIVISION CF MINERALS AND GEOLOGY <br />(1995) <br />sheet 1 of 2 sheets <br />REFERENCES: 1) Cost Reference Guide (CRG) <br />2) Contractors Equipment Cost Guide (CECG) <br />3) Colorado Contractors Association <br />Uage Rate Ech edule <br />4) Caterpillar Performance Handbook <br /> ----------- Base Ownership 8 Overhaul Costs ------------~ --------------- ease Operating Costs --- ---- ---- ---- <br /> Ownership ~ Over haul ~ Field Repair <br /> Deprecia tion CFC Overhead ~ Labor Parts Labor Parts ~ Fuel Lube Tires G.E .C. <br />_________________________ <br />Machine ___________ <br />516 ______ <br />.90 ____________ <br />56.89 _________ <br />56. ___ <br />90 ________ <br />54.63 ________ <br />512.31 ________ <br />55.14 ________ <br />59.89 _____ <br />511. ______ <br />28 ~ __________ <br />53.37 ___ <br />50. ____ <br />00 _____ <br />51. ___ <br />55 <br />Attachment #1 50 .00 50.00 50. 00 50.00 50.00 50.00 50.00 50. 00 50.00 50. 00 50. 00 <br />Attachment k2 53 .63 50.89 50. 84 50.77 51.42 51.41 51.19 50. 00 50.31 50. 00 50. 99 <br />[OSi ADJUSTHENT FACTORS (CECG) <br />Factor Description Base Value Adj. Value Multiplier <br />Acquisition cast:' 5355,510.00 5273,420.25 0.769 <br />Econ. life hrs.-machine: 13,245 10,455 1.267 <br />-attach. #1: 11,000 11,000 1.000 <br />-attach. #2: 8,200 8,200 1.000 <br />Annual use hours: 2,112 1,525 1.385 <br />Mechanic's labor cost: 527.15 523.49 0.865 <br />Fuel cost/gal.-gasoline: 51.20 51.20 1.000 <br />-diesel: 51.07 51.07 1.000 <br />Lube cost: 53.37 53.37 1.000 <br />Tire life hours: ~ 0 0 1.000 <br />Tire factor: 0 0 1.000 <br />Tire cost: 50.00 50.00 1.000 <br />ADJUSTED EOU[PHENT T05TE <br />ACOUIEIiION COST BREAKDOVN <br />Cost Elements (CECG) Factor Adj. Cost <br />Base purchase price 5355,510. 00 <br />Less dealer discount 0.142 550,482. 42 <br />Plus freight 0.020 57,110. 20 <br />Plus dealer charges' 0.005 51,777. 55 <br />•CDMG estimate --------- --- <br />Adjusted purchase price 5313,915. 33 <br />Plus taxes: Sales a 3% 59,417. 46 <br />.EHM a2% 56,278. 31 <br />Less tire cast 50. 00 <br />Less salvage value 0.179 556,190. 84 <br />Net acqui siiion cost 5273,420.25 <br /> <br />_ <br />______ <br />_ <br />___ ~ <br />______ ---------- Adjusted <br />________ Ownership 8 Overhaul Costs ---------~ ------------- Adjusted <br />__________ Operating Costs ----- <br />_ ___________________ -------- <br />________ <br /> <br />___ <br />_____ <br />Acquisition cost ____________ <br /> <br />515.79 ___________ <br /> <br />N/0. __________ <br /> <br />N/A ________ <br /> <br />N/A ________ <br /> <br />N/A ________ <br /> <br />N/A <br />________ <br />N/A <br />_______ <br />N/A <br />_____________ <br />N/A <br />________ <br />N/A _ <br />____N/A <br />Econ.life -Dozer 8 BOPS ~ 520.00 N/A N/A 55.87 515.60 56.51 512.53 N/A N/A N/A N/A <br />-Attach. ~2 N/A N/A N/A 50.98 51.80 51.79 51.51 N/A N/A N/A N/A <br />Annua{.usage 521.87 510.77 510.72 N/A N/A N/A N/A N/A N/A N/A N/A <br />Double shifts 516.40 55.39 55.36 N/A N/A N/A N/A N/A N/A N/A N/A <br />Triple shifts 514,59 53.59 53.57 N/A N/A H/A N/A N/A N/A N/A N/A <br />Mech.labor-Dozer 8 ROPE N/A N/A N/A 55.08 N/A 55.63 N/A N/A N/A N/A N/p <br />-Attach. k2 N/A N/A N/A 50.84 N/0. 51.55 N/A N/A N/A N/A N/A <br />Fuel/tube -Dozer 8 ROPE N/0. N/A N/A N/A N/A N/A H/A 511.28 $3.37 50.00 51.55 <br />-Attach. K2 N/A N/A N/A N/A N/A N/A N/A 50.00 50.31 50.00 50.99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.