Laserfiche WebLink
<br />ROADABLE EQUIPMENT: <br />---------,.____---- Total Eqp. <br />Machine Description Last/hr <br />Flatbed Truck 30K GVN <br />E41.69 <br />) E41.69 E47.69 <br />_________________________________ ____________________________SUbtotals =________E41.69 ________E41.69 <br />MOB/DEMOB SUPPORT EOUI PMENT: --------- --------- <br />--------------------------- Neight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Non-Roadable Eqp. Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Lost/hr Cast/ea <br />_________ _______________________________________________________________________________________________ __________ <br />_________ __ ________ _______________________________________ __________________________ <br />Subtotals E0.00 E0.00 E0.00 <br />Total Eqp. Fleet Size Haul Trip Return Trip <br />Roadable Eqp. Description Lost/hr (no. hauled) Cost/hr Cost/hr <br />Subtotals <br />EOUI PMENT HAUL DISTANCE 8 TIME <br />Nearest major city or town Nithin project area region: Naturita <br />Total one way travel distance = 20.0 miles. Average travel speed = <br />Job Time - Non Roadable Equip.= 0.50 hours Load Roadable Equip.= <br />0.50 hours haul <br />0.50 hours unload <br />0.50 hours return <br />JOB_ COST <br />Total Mob/Demob Cosx = E1,547.05 <br />E0.00 E0.00 <br />-40.00 mph. <br />N/A hours load <br />0.50 hours haul <br />N/A hours unload <br />0.50 hours return <br />NOTE: Non-roadable equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially far equipment which must be <br />partially dismantled for transport and re-assembled at the job site. Costs for lifting equi Anent and other <br />support equipment needed for this cork should be included in the mob/demob costs. <br /> <br />I <br />sheet 2 of 2 <br />Fleet Size Haul Trip Return Trip i <br />(no. hauled) Cost/hr Cost/hr 'i <br />