Laserfiche WebLink
• <br />RECLAMATION COS7~3 EXHIBIT L <br />[Rules 8 Reps §6.4.12] i <br />CONiTRYCTION MATlRIAL FIL! N~ M 2001- 002 <br />ReouLAR 112 OreMnoN <br />~' WEIMER ONE GRAVEL'S <br />APrll zoos <br />Case I: Assttming Initrta/ Phase in Progress/Essdntially Complete <br />DIRECT COST <br />JOB JOB EQUIPMENT i JOB DE CRIPTION JOB <br />LOCATION HAUL DISTANCE pUANTITY <br />O Sou[h & Cat 633 Scraper @ $0.411/CY EARTHWORK - eadwall Slope $9,066 <br />West Average haul = SOOft Reduction Back-fill <br />Highwalls Source: N-Central stockpile & NW 1,350ft : 20ft a ~lOft + 2 + 27ft'BCY : <br /> Disposal bench <br />---------------------- I 1.09 Swel] Factor = 21,SOOLCY <br /> <br />Interior <br />Cat D-8N Bulldozer @ $0.158/CY EARTHWORK -~ <br />Cut & Fill 9ft Wall - - - - - - - <br />West Wall Average haul = 15ft Slope Reduction <br /> Sotuce =Cut & Fill Dozing SSOft : '/e(9ft) a Y~(9ft z 3) + 2 + 27ft' a <br /> 1.09 Swell Factor = 674 LCY <br /> <br />E-Pit Worked- ------ <br />COMPLETE - <br />CO LETS ------- <br />.. . <br />out Hi-walls <br />B North Cat D-8N Bulldozer @ $0.158/CY EARTHWORK - eadwall Slope 51,579 <br />Highwall Average haul = ISft i Reduction Dozing <br /> Source =Cut & Fill Dozing 1,100ft : 15ft a $Oft + 2 + 27ft'BCY a <br /> 1.09 Swell Factor ~ 9,992LCY <br />• Initial Exc., Cat D-SN Bulldozer @ $0.115/CY EARTHWORK - iRip-loosen High- $2,946 <br />Process, and Average rip depth = 1 ft Traffic (flat bench) areas <br />Stockpile Flat Areas = 7.23 Ac old pit (E. of road) ~ <br />Areas + 8.65 Ac new exc. (W. of road) 15.88Ac a 43 <br />560=/Ac a lft + <br /> = 15.88 Ac total pit floor , <br />27ft'BCY ~ 25,620CY <br />O Initial Exc. Cat 633 Scraper @ $0.411/CY EARTHWORK - pread Soil (on emb . 51,261 <br />& and Process/ Average haul = SOOft & head~all slope-banks only) <br />Stockpile Source: Stockpiles @ SW & W site bdy ~ <br />Slope-banks Areas = [ 1,150 + 2,250ft ] : 44.72ft + 3.49Ac: 43,560ft}/Ac a %ft + <br /> 43,560ftz/Ac = 3.49Ac 27ft'BC1~ a 1.09 Swell Factor ^ 3,069 LCY <br />b All Areas RE-VEGETATIO -Fertilize, Seed, & $14,158 <br />Disturbed Mulch <br />(flats & slopes) ©Grass-drill, Tractor, Straw-blower, <br /> 8c Crimper @ $671.10/Ac 15.88 Ac : 5671. (0 = 510,657 15.88 Ac <br /> © Broadcast-seeder, Straw-blower, & ~, <br /> Crimper @ S 1,003.28/Ac <br /> 3 49 Ac: $1,003. 8 = $3,501 <br />3.49 Ac <br />West Labor, Equipment & Materials NSTRU TI - F n in $2,128 <br />Boun $2.09/LF Re lace/Relocate -str barb-wire fence 1 01 B-R <br /> DIRECT COSTS sub-total $31 138 <br /> MOBILIZATION 5% $1,557 <br /> TOrnt. Dn2ECT Cosr 832 695 <br />Corrtlnwd NEXT PAGE Q <br />2F <br />