Laserfiche WebLink
S9ater for dust suppression is available from the Oasis <br />ditch approximately one mile SW of the quarry site and adjacent <br />to the haul road. Mid-Continent holds a water right of .9 cubic <br />feet of water per second in that ditch. <br />All natural or diverted water courses will be riprapped <br />and all pad or working areas will be graveled. The quarry itself <br />is obviously solid rock. All water courses that are diverted <br />will be returned to AOC or designed (rock, meandering, etc.) so <br />as to not change the hydrologic balance of the area. <br />We believe there will be less sediment produced from <br />this area than from premining conditions. <br />