Laserfiche WebLink
iii iiuiiiiiiiii iii 1-I l--t; ~~ <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />7313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 8663567 <br />FAX: (303) 832-8106 <br />December 20, 2001 <br />Mr. George Zadel <br />Northern Colorado Constructors, Inc. <br />Aggregate Division <br />18100 WCR 19 <br />Johnstown, CO 80534 <br />RE: NCCI Pit #1, Regulaz 112 Application, Adequacy Review, File No. M-2001-107 <br />Deaz Mr. Zadel: <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MININ G•SAFE7Y <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Eneculive Director <br />Michael B. long <br />Division Director <br />Listed below are adequacy review comments on the above-captioned Regulaz 112 Application. <br />The decision date for your application is scheduled for February 18, 2002. Therefore, I would <br />appreciate a response from you on or before January 25, 2002. Any public comments that we <br />receive on your application during the interim will be forwarded to you. Attached to this <br />adequacy letter aze copies of comments received from the Corps of Engineers, Office of State <br />Engineer, and Platte Valley Soil Conservation District. Please be advised that your application <br />may be deemed inadequate and maybe denied on February 18, 2002 unless the following <br />adequacy review items are addressed to the satisfaction of the Division. <br />6.4.3 EXHIBIT C -Pre-MinlnE and Minins Plan Mauls) of Affected Lands <br />1. Please revise.the existing condition or mining plan map to include the location of the Meadow <br />Island Ditch No. 1 and the dischazge ditch from the Sand Hill Reservoir. Neither ditch could be <br />found on the maps provided. Please respond. <br />6.4.4 EXHIBIT D - Minine Plan <br />2. The applicant states on page 14 only one section or portions of two sections and the processing <br />azea will be disturbed during any phase of mining. (A typical section will be about 10 acres in <br />size). The applicant states on page 15 that excluding the processing azea and stockpiles, a <br />maximum of 25 acres will be disturbed at any one time, In conformance with Rule 6.4.4(d), <br />please clarify the maximum disturbance to be expected during the mining and reclamation <br />operation. Such maximum disturbance should include the acreage of the stockpile and plant <br />