My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134795
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134795
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:29 PM
Creation date
11/26/2007 2:43:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
3/13/2006
Doc Name
Amendment Area Mine Facilities
From
pg 2.05.3(3)-10 Cover to 2.05.3(3)-10-75
Section_Exhibit Name
NH2 Section 2.05.3(3) Attachment 2.05.3(3)-10
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• When the ponds are removed, the affected land will be regraded and revegetated pursuant to the <br />CDMG's regulations, Section 4.05.17 and the approved WFC Reclamation Plan. <br />4) Pond 008 through 013 Designs <br />Tables 2.05.3(3)-1 and 2.05.3(3)-2 list the values of CN and "k" for different soil and vegetation <br />types at the New Horizon Mine. The tables have been revised to address new soils found in the <br />amendment area. <br />The curve number (CN) and "k" factor for each of the ponds is determined as a weighted average. <br />The undisturbed area curve number and "k"factor information is based on the soils and vegetation <br />information found within Sections 2.04.9 and 2.04.10, respectively, of the New Horizon mine permit <br />application. <br />The pond volumes are calculated by first using the Curve Number and Runoff Routine within the <br />Hydrology module of the SURVCADD software and then using the USLE sediment storage routine <br />within the Hydrology module of the SURVCADD 2000 software. The LS factors for the USLE are <br />determined from the 3D CAD grid model of the drainage areas for each pond. The water volume <br />• is determined from the weighted average CN for the watershed based on the worst case conditions <br />over the life of the mine and the appropriate design storm rainfall. Curve numbers used are from <br />78 to 90 based on the existing conditions, level of disturbance and the hydrologic soil type of each <br />watershed. Once the required volume of sediment and storm inflow is known, these two are <br />combined to get the total required volume. SURVCADD was then used to design ponds in each <br />location which had the parameters described in the previous section. All ponds were designed to <br />contain the 25 year 24 hour event except Pond 010, which was designed to safely pass the 25 year <br />event through the emergency spillway. <br />Shown on the following two pages are the calculations used by the SURVCADD Program in <br />determining the pond volumes. <br />• <br />(Revised 12/01) Attachment 2.05.3(3) -10-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.