Laserfiche WebLink
• ATTACHMENT 2.05.3(3)-10 <br />TABLE OF CONTENTS <br />AMENDMENT AREA MINE FACILITIES <br />AMENDMENT AREA MINE FACILITIES ...............Attachment 2.05.3(3) -10-1 <br />Introduction .....................................Attachment 2.05.3(3) -10-1 <br />Sediment and Water Control Facilities Plan .............Attachment 2.05.3(3) -10-1 <br />Sedimentation Ponds 008 through 013 Design Parameters Attachment 2.05.3(3) -10-2 <br />Pond 008 through 013 Designs .......... ............Attachment 2.05.3(3) -10-5 <br />POND 008-10YR ................ ............Attachment 2.05.3(3) -10-8 <br />POND 008-25YR-24HR ........... ...........Attachment 2.05.3(3) -10-11 <br />POND 009 ..................... ...........Attachment 2.05.3(3) -10-34 <br />POND 10 ...................... ...........Attachment 2.05.3(3) -10-59 <br />• POND 11 .................................Attachment 2.05.3(3) -10-76 <br />POND 12 .................................Attachment 2.05.3(3) -10-79 <br />POND 13 .................................Attachment 2.05.3(3) -10-82 <br />Collection Ditches, Culverts and Diversion Design ParametE~achment 2.05.3(3) -10-85 <br />Collection Ditches and Diversion Designs .............Attachment 2.05.3(3) -10-90 <br />Small Exemption Areas ..........................Attachment 2.05.3(3) -10-119 <br />Haul Roads and Other Facilities ......... ...........Attachment 2.05.3(3) -10-121 <br />General Requirements ........... ...........Attachment 2.05.3(3) -10-121 <br />Location . ..................... ...........Attachment 2.05.3(3) -10-121 <br />Design and Construction ......... ...........Attachment 2.05.3(3) -10-121 <br />Drainage ...................... ...........Attachment 2.05.3(3) -10-123 <br />Maintenance .................. ...........Attachment 2.05.3(3) -10-123 <br />...................... ...........Attachment 2.05.3(3) -10-123 <br />• Restoration ................... ...........Attachment 2.05.3(3) -10-123 <br />(REVISED 2/00) <br />