My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134795
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134795
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:29 PM
Creation date
11/26/2007 2:43:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
3/13/2006
Doc Name
Amendment Area Mine Facilities
From
pg 2.05.3(3)-10 Cover to 2.05.3(3)-10-75
Section_Exhibit Name
NH2 Section 2.05.3(3) Attachment 2.05.3(3)-10
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• E = R * K * Ls * C * P ,where all the parameters are as defined above <br />Volume Calculations <br />Required User Input <br />Sediment Delivery Ratio (DR) :Default = 0.37 <br />Time Period,T (years) :Time of analysis; typically the time of the storm event <br />Density of the sediment (D) :The post-deposit density of the sediment <br />Runoff (I) :Calculated from some other routine like Curve Number and Runoff <br />Total Erosion (E, tons/year) =Sum of (E * Area) for all the areas. <br />Total Yield (Y, tons/year) = E * DR <br />Sediment volume per year (Vs) = Y /Density <br />Total Sediment Volume = Vs * Time period <br />Runoff Volume =Runoff (I) * Total Area <br />Total Pond Volume =Runoff Volume + Total Sediment Volume <br />• Enclosed on the following pages are the volume calculations for each pond. Map 2.05.3-13 shows <br />the detailed plan views and cross-sections for all ponds. All ponds will utilize a keyway cut into the <br />dam and seep collars on the principal spillway pipe as shown on the map. All dams will have a <br />combined slope of 5.0:1.0 and will be compacted in no greater than 8" lifts to 90% of the tested <br />maximum dry density of the material. All ponds wilt also be marked on site with a graded vertical <br />rod which marks the 60% cleanout level for sediment collection. This level is defined as 60% of the <br />calculated 3 year sediment volume. The pond will be cleaned out when the sediment reaches this <br />level. <br /> <br />(Revised '12/01) Attachment 2.05.3(3) -10-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.