Laserfiche WebLink
CIRCES Cost Estim <br />BULLDOZE ating Software <br />R WORK <br />PROJECT IDENTIFICATION <br />Task K X05 State Colorado Permivjob# C-1981-019 <br />Date . 02/10/2005 County Mo/ta1 Ab6revrabon none <br />User JRS Site Coldwyo Mine Filename C019-X05 <br />Agency or organization name Colorado Drwsion O1 Minerals And Genlo<!v <br />Permit or other job adion Nonce ol6rtenf X-2005-109-f i <br />task dr~scnnuon Replace Topsoil from S tockpile to Roads <br /> <br />HOURLY EQUIPMENT COST <br /> Basrc machine .Cat D9R - 9SU Hmsepowar . 405 <br /> Blade type Semr-Universe! <br /> Attachment no. t ROPS Cab Shift bests 1 per day <br /> Attachment no. 2 3-shank upper <br /> Date source (CRG) <br /> Ultlization °i; <br />Cost Breakdown Ownership costlhour 551.01 NA <br /> Operating cosUhour $93.54 100 <br /> Ripper op costlhour $0.00 0 <br /> Operator cosUhour S31 76 NA <br /> Total umt cosVhour 5776.31 Total fleet cosUhour 5176.31 <br /> <br />MATERIAL QUANTITIES <br />In~hal Swell Loose <br />volume 18.100 BCY factor 1.250 volume 22,625 LCV <br />Source ;.t estimated volume ;Division Eshmato <br />Sowca of estimated swell lector . CA T Handbook <br />HOURLY PRODUCTION Job Condition Correction Fedora Source <br /> Operator skill 0 75 (avg.) <br />Average push distance 100 feet Matenal consistency . 1.00 (Cat HB) <br />Unao(ustad howdy produdion 1,243.2 LCY/hr Dozing method 100 (pan 1 <br /> Visibility 100 (avgJ <br />Material consistency description Job effiaency 0 83 (fshi/Uday) <br />Consolidefed stockpile Spoil pile 0 80 jlnd-rn <br /> Puah gradient 0, 90 (Cat H81 <br />Average push gradient 500 % (pos) Altitude 0 95 (Cat HBl <br />Average sde altitude 7, 700 feet Material weight 0 90 (Cal He) <br /> Blatle type 1.00 (S/SlJ/U) <br />Metenal weight 2.550 IbsILCY Net corredion 0.39 <br />Weight descnption <br />EaAh -Dry packed <br />JOB TIME AND COST <br />Fleet site f Dozers) <br />Und cost . SO 368 /LCV <br />Ad)ustad unit produ: t~rrr 4'9 16 .i: Whr <br />Adjusted Beet produa~o~~ 479.16 t.rJ'nnr <br />Total fob time 47.22 Hours <br />Total fob cost 58.325 <br />