Laserfiche WebLink
b) The Board will enter the lands to perform reclamation only if the Board has determined: <br />i. that reclamation required by the permit, statute, or regulations to be performed upon <br />such lands has not been performed, or <br />ii, that financial warranty forfeiture proceedings described in the Aot or similar provisions <br />of subsequent laws, if any, have been initiated. <br />c) The Division, acting for the Board, will enter lands to respond to an emergency only where the <br />Division determines that any of the conditions of Construction Material Rule 8.4.2. exist. <br />7) The additional conditions set forth in the attached rider, if any, are incorporated herein by reference. <br />/-_J a) Rider is attached. <br />/~/ b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />~ ~~~ ~ <br />RONALD W.CATTANY <br />Di~~sion Director <br />