Laserfiche WebLink
II I I II I II I II IIII III o0c Da et 1211112001 <br />~1E `~~;an 2, b ~ .~ 999 <br />• 2.06 REQIIIREMENTB FOR PERMZTB FOR <br />BPECIJIL CaTEGORIEB OF !lINZNG <br />2.06.1 Scope <br />This Section establishes the minimum requirements for <br />permits for special categories of surface coal mining and <br />reclamation operations which are in addition to the other <br />applicable requirements of Rule 2. , <br />2.06.2 Experimental Practices Mining <br />WFC does not plan to engage in any experimental mining <br />practices at the Golden Eagle Mine. _ <br />2.06.3 Mountaintop Removal Mining <br />• No surface mining our mountaintop removal is planned at <br />the Golden Eagle Mine. <br />2.06.4 Steep Slope Mining <br />Operations at the Golden Eagle Mine will not include steep <br />slope mining. <br />2.06.5 Permits Incorporating Variances from Approximate Original <br />Contour Restoration Requirements for Steep Slope Mining <br />Because WFC does not plan steep slope mining, this Section <br />is not applicable. <br />2.06.6 Prime Farmland <br />• WFC does not plan to mine prime farmland because there are <br />no prime farmlands in the area to be disturbed by the Golden <br />Eagle Mine. <br />2.06-1 <br />