Laserfiche WebLink
MR 9G-141 - SI?Lh-CLI?ANING MAGNET ANU'I'IsMPOIL1KY CONVRI'OR 131:L"fS <br />A Scll~-Clcanin~ (\4a,net <br />Dimensions: <br />Concrete caissons: 4 (ril 18", 14' deep = <br />Steel support structure: 4 u) 25' s S" .~ 8" _ <br />40' ~ 8" s 8" _ <br />Masnet 3' x 2' ~ 4~ _ <br />Removal Costs: <br />Concrete: 561f x $14.911f = <br />Steel: 86 cf x 18t/cf = <br />Suhtotal <br />B. tcmporarv Bel[ from Rock Belt Discharee Pile to Low Quality Coal Pile/Prep Plant <br />Dimensions: <br />Feeder: 12' x 12' x 20' _ <br />Drive/Head pulley pad: 8' x 10' x I' _ <br />Belt Structure: _ <br />Removal Costs: <br />Feeder: 2,880 cf x 18</cf = <br />Pad: 80 sf x $3.15/sf = <br />Belt Structure: 800 If x $10.92/If = <br />• Sub[o[al <br />C. femporary Belt from Low Quality Coal Pile to Prep Plant <br />Dimensions: <br />Feeder: 12' x 12' x 20' <br />Belt Structure: <br />Removal Costs: <br />Feeder: 2,880 cf x ! St/cf <br />Belt Structure: 800 If x $10.92/If <br />Suhtotal <br />SUMtv1ARl' <br />A. Self-Cleaning Magnet/Removal Costs <br />13. "temporary Belt from RBDP to LQCP/PP/Removal Costs <br />C. Temporary Belt from LQCP ro PP/Removal Costs <br />' Snbtntal <br />• Admin (17%) <br />Total <br />Say <br />56 If <br />44 cf <br />I8 cl <br />24 cl <br />x x3s.oo <br />x 16.0(1 <br />$ 851.00 <br />2,880 cf <br />80 sl' <br />800 I f <br />$ 518.00 <br />$ 252.00 <br />$ 8.736.00 <br />$ 9.506.00 <br />_ x,880 cf <br />= SOOIf <br />_ $ 518.00 <br />_ $ 8,736.00 <br />_ $ 9,454.00 <br />$ 851.00 <br />$ 9,454.00 <br />$ 9,506.00 <br />$19,611.00 <br />$ 3.334.00 <br />$22,945.00 <br />$23,000.00 <br />MR 97-154 7.1 10/2/97 <br />