Laserfiche WebLink
I'K 73-113 I:NIU Ills\\'A'I'GRING hACILITY -continued <br /> <br />Build ing d'r. Pad Removal <br />L.Unl rl'll' Pad 15' ~ 30' s .~ _ <br />Building 10' .~ I ~ .~ 30 = <br />Concrete - 45o SF x $ 10.26 = <br />Building Removal - 4,500 CF s .181 CF = <br />kevcgctation: Cost per acre for disking, harrowing, contour furrowing, <br />sceding, and fertilization @ $259.19/acre <br />20% titilnre rate, including seeding and fertilization, ~;` $123.32'acre <br />(3.9 acres x $259.19/ac = $1,010.84)+(.78 ac x $122.39/ac = $9.46) _ <br />Summmv <br />• <br />• <br />Borehole Locau~;, <br />Structures <br />Garth 11~ork <br />Shaft Abandonment <br />Revegeta[ion <br />Treatment Pond Location <br />Pond Removal <br />Topsoil Replacement <br />Ripping <br />Pad Building & Removal <br />Revegetation <br />Sub Total = <br />AdminCosts(17.31%) _ <br />Total = <br />Say <br />MR 97-154 <br />66(b) <br />aso sF <br />4,00 CF <br />$ 4,617.00 <br />810 CP <br />$ 1,106.30 <br />$ I , 183.00 <br />$ 19,639.00 <br />$ 5,445.00 <br />$ 1,007.00 <br />$ 7,002.00 <br />$ 7,385.00 <br />$ 43.00 <br />$ 4,617.00 <br />$ I , 1116.00 <br />$ 47,477.00 <br />$ 8 218.00 <br />$ 55,695.00 <br />$ 5,700.00 <br />10/2/97 <br />