Laserfiche WebLink
i\IR 96-135 - 1~:111D V6:NTILA"PION tiHAF'f - cnntiuucd <br />• <br />Shah r\bandanmenl <br />705.4 ; cl% 3 ct%sack cement = 236.14 sacks (~ $9/sack = $ 2,125.26 <br />33,442.57 ct%3cf%sack surge) = 7.514 19 sacks a $G/sack = a 4G,S55. 14 <br />I G hrs of a drill rig, water[ruck, flatbed truck, pickup <br />u uck, and dozer rr $315.24/hr = $ x,043.54 <br />marker3 n, $2.00 = $ 4.0(1 <br />Subtotal = $ 54,05824 <br />Reve~,etation: Cost per acre for disking, harrowing, contour furro~~~ing, <br />seeding, and fertilization ~ $259.19/ac <br />20% failure rate, including seeding and fertilization @ $122.39/ac <br />(2.83 ac ~ $ 259.19 = $730.92) + (.564 ac x $122.39 = $69.03) _ $ 799.95 <br />Subtotal EMD Ventilation Shaft = $128,550.00 <br />Admin Costs (17%) _ $ 31,854.00 <br />To[al = $150,404.00 <br />Say = $ 150,000.00 <br />• <br /> <br />MR 97-154 <br />64(b) 10/2/97 <br />