Laserfiche WebLink
N1129~-129-1~;\CILI"1'11:5,4DllITION (continued <br />• ~ i'ulvcrts E-'-B and ~.-2-C <br />StnicWral demolition, culvert removal (2j 21 <br />culverts, 25' long ~ $7.72/If <br />Subtotal <br />P. I:ail Car Off-loadim~ Site <br />I-beam, wood removal, excavate backtill w/ backhoe <br />(Shr (c~ $75/hr) <br />I Iaul Fi place backtill w/ 631 E Scraper (I hr u! $ I G I/br) <br />Subtotal <br />Summary <br />A. <br />B. <br />C. <br />D. <br />E. <br />P. <br />• <br />• <br />Trailer <br />Winter Parking Islands <br />Slope Belt Drive Building <br />Borehole Pump Substation <br />Culverts E 2-A and E-2-B <br />Rail Car Off-loading Site <br />Sub-total <br />Admiit Fee (17%) <br />Total <br />_ $ 3SG.11(1 <br />_ $ 386.011 <br />_ $ 61111.(1(1 <br />_ $ 161.00 <br />_ $ 7G 1.00 <br />_ $ 3,8(12.0[1 <br />_ $ 2,832.00 <br />_ $ 7.73~.1)ll <br />_ $ 1,714.(1(1 <br />_ $ 386.00 <br />_ $ 761.110 <br />_ $ 17,220.00 <br />_ $ 2.928.00 <br />_ $20,143.00 <br />MR 97-1 ~4 62(aj 10/2/97 <br />