My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134612
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134612
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:18 PM
Creation date
11/26/2007 2:30:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
5/21/2004
Section_Exhibit Name
Appendix A Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IfU1LUING IL 6:~4O\'AL - MR94-107 <br />• Ihilii) liuildin_ 19'.~ 19~s I(1~ = 3,61(1 CF <br />3,G 10 CP s $.20/CP = `~ 7''2(10 <br />Ducnrorl:: I I ~ 63~ ~ 10' = 6,820 CF <br />6.s2o cF . $.2o/cF = $1.364.00 <br />Pan.lnlrt and Pvose <br />Pan: 6.4' ~ 9.17 dia = a33 CF <br />423 cf ~ $?0/CF = $ 85.011 <br />Inlet: I I' ~ la.a' a lo' = I,sBa <br />I,ss4 cF. $.2o/cF = $ 317.00 <br />L'vase': 13.5' x I I?' dia = 1,331 CF <br />1,331 CF ~ $10/CP = $ 266.00 <br />Building Subtotal = $2,754.00 <br />Shah Sealin, <br />Bottom Plug (from floor up shaft 5'): I s' ~ 16' dia = 117 CY <br />117 CY s $84/CY = $9,828.00 <br />Placement of foundation and fill material into shaft foundation materials = 70 CY <br />70 CY s $5.06/CY = $ ;54.00 <br />till material = 600 CY <br />push fill into shaft (300' push) <br />use D9N, with hourly productivity of 600 CY/hr: cost of D9N is $100/hr. <br />• 6110 CY pushed in I hr = $ 100.00 <br />I'iip Plug <br />2` x 16' dia = I s CY <br />I5 CY z $84/CY = $ 1,260.00 <br />±' fill and plant growth material: s0 CY to be moved, use same equipment as above <br />50 CY to be pushed = 0. I hr <br />(1.1 hr x $100/hr = $ 10.00 <br />Powerline Line Removal/Disposal <br />400 If n $1.72 /If = $ 722.00 <br />Site Grading <br />16,000 CY to be taken from Equipment Storage Site <br />16,000 CY at 600 CY/hr = 27 hr <br />27 hrs x $100/hr = $2,700.00 <br />Bond Summary (MR94-107 <br />Building Removal = $ 2,754.00 <br />ShuftSealing = $11,552.00 <br />Powerline Removal/Disposal = $ 72200 <br />Site Grading = $ 2,700.00 <br />Subtotal = $17,728.00 <br />• Admin Fee (17.37%) _ $ 3,079.00 <br />Total $20,807.00 <br />Say = $20,800.00 <br />MR 97- I Sa 44 10/2197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.