Laserfiche WebLink
SIIRh:\CI? iYiODIFIC'AT-nN i\'O.3: 'v1'ASI'1? 14'A"I'1?R TItEATMGN7" f~ACILI"f l' <br />• i\. Ifuildm_ Removal <br />\sstm,e building I6' X 12' X 9' <br />16 X 12 X 9 = 1,728 CF <br />172s cP x o.zo/cr = $ 3a6.oo <br />i\ssume slab 16' X 12' X .5 <br />16X 12 = 192 SF <br />192 SPX $/SP4 = $ 765.00 <br />B. I'owerline Removal. <br />4 poles X $IS/pole = $ 60.0(1 <br />C. Remove Inlet Sh uc[ti re <br />I ): '250 = $ 250.00 <br />D. IZeerade and Remove Roads and Ranw <br />Assume 8237 CY and use a D9N to do work <br />Average Push Distance 240 fee[, 0% Grade <br />Production = G00 CY/hr <br />5237 CY/600 Cl'/hr= 13.7 hr X $100/hr = $1,370.00 <br />G. IZeapph~ Topsoil <br />Use same assumptions as D except 4000 CY of topsoil <br />4000 CY/600 CY/hr = 6.7 hrs X $100/hr = $ (,70.OU <br />• F. Reveeeta[ion <br />2.4 acres X $219/acre = $ 526A0 <br />Subtotal = $3,644.00 <br />Compressor Building Removal <br />A. 13uildine Removal <br />Assume building 14.5' X 30' X 23' <br />14.5 X 30 X 23 = 10,005 CF <br />10005 CF X .20/CF = $2,001.00 <br />Total Bond = $3,644.00 <br />Waste Water Facility = $2,001.00 <br />_ $5,645.00 <br />Admin 10% _ $ 565.00 <br />$6,210.00 <br />• <br />MR 97-154 35 10/2/97 <br />