Laserfiche WebLink
SI'I'li I la ACCICSti ItOAU/1'UMP11C)U5E Itl?LLAMA"I.1ON - MR91-GZ <br />• ,\. :\ccrss Road -topsoil I(cplaccmcnt ~`L Rippim~ <br />Itl' X 5110 = [1.12 acres <br />(_'osl - i GG to blade topsoil across road Irom windrow and rip say i.0 hours <br />I lourl_v Cost $122a(I X I.0 hours = $ 129.x0 <br />Sav = $ 130.00 <br />li. Iluildine and Pad Removal <br />liousing 10' X 10 \ 12' (approximate) Say = 12(10 ft' <br />I G4/li' Say = $193.00 <br />Pad 13~ X 12' X I' (appmximate) Say = lax ft' <br />14a ft' X $2.42/f[= Sav = $34R.50 <br />Kemoval of Material Say = $ 37.00 <br />C. Reseedinu <br />O. L acres X $21200/acre = $ 26?R <br /> Say = $ 27.00 <br /> Subtocal = $724.50 <br /> 10%AdminCost = $IRI.00 <br /> Total = $90s.00 <br /> Say = $900.00 <br />u <br />• <br />A1R 97- l s4 27 10,'2/97 <br />