Laserfiche WebLink
I'R 91-I? ItONI) INCRI?ASIa <br />• Surl;icc I ;icililic~ and Ruads . <br />lined :unount dircc(h- Drum Pzrmd C-S I-(171 lur thzsc azhvuies. <br />tizc letter dated 22 .I;muarv 1957 to Dan Mathews <br />Car l op S;unplinu Tower & Parkin', Area <br />\. Removal of "tower <br />I. 16 hours of general labor time required to remove tower <br />3. General labor wage <br />1. One time of $ 150 to remove tower from site <br />Labor 16 hours X $ I ~/hr <br />Removal tee <br />li. Pad Renwval <br />I . 8; X 10' X I' = 2.96cy concrete Say <br />' 27 <br />?. $3.70/CY for removal: 3 X $3.70 <br />C. Road Base Material Removal <br />I. 10' x 2(1' ~ I' = 13.3 CY, Sav <br />'. One time removal fee <br />= r_ X9.1 51.110 <br />_ $IS/hr <br />_ $240.00 <br />_ $150.00 <br />_ $390.00 <br />= 3CY <br />_ $ 11.10 <br />= 13C}, <br />_ $300.00 <br />U. Culvert Removal <br />I . One laborer = 4 hours <br />3. 4 hours X $ 15/hr = $ 60.00 <br />L. Bond Summary <br />"tower Removal <br />Pad Removal <br />Road Base Material <br />Culvert Removal <br />Subtotal <br />10% Admin Fee <br />Say <br />Railroad Track <br />The bond estimate for the extension presented below covers the following: <br />I . removal of railroad bed and embankment <br />2. backfilling and grading <br />3. topsoiling <br />• 4. revegetation <br />_ $.390.00 <br />_ $ 11.00 <br />_ $300.00 <br />_ $ 60.00 <br />_ $761.00 <br />_ $ 76.10 <br />_ $550.00 <br />M R 97- 154 24 10/2/97 <br />