Laserfiche WebLink
TABLE L-2 RECLAMATION COSTS <br /> Unit Quantity Price Total <br /> BACKFILL CY 56,800 $1.25 $ 71,000.00 <br /> EXCAVATION <br /> WITH <br /> OVERBURDEN AT <br /> 3H:IV SLOPE <br /> (5 acres) <br /> BACKFILL CY 222 $1.25 $ 277.50 <br /> SETTLING POND <br /> 100'X20'X3' <br /> SCARIFY PRIOR TO ACRE 11.8 $100.00 $ 1,180.00 <br /> SEEDING <br /> (excavations, process <br /> area, backfill areas, <br /> stripped areas, roads, <br /> overburden& topsoil <br /> areas) <br /> PLACE 4 TO 8 CY 6,000 $1.25 $ 7,500.00 <br /> INCHES TOPSOIL <br /> (excavations, backfill <br /> areas, stripped areas) <br /> SEEDING, ACRE 26 $750.00 $ 19,500.00 <br /> MULCHING, <br /> FERTILIZING <br /> RESEEDING (20% ACRE 5 $750.00 $ 3,750.00 <br /> non-germination) <br /> TOTAL COST $103,207.50 <br /> Notes/Descriptions: <br /> Backfill excavation slope with overburden; 3H:IV, average depth 14', 294 sf cross-section area. <br /> Excavations include the following areas: inside perimeter of the north and east of Phase 2; east <br /> side of Phase 1; and excavations in Phase 3. <br /> 19 <br />