Laserfiche WebLink
L If final specifications for construction of the slurry walls differ from the draft <br />specifications, Aggregate Industries will provide DMG a copy of the final version for <br />review, as a technical revision; <br />2. Aggregate Industries' mining operation will not intersect ground water in Phases 2, 3, <br />'and 3A until the DMG has reviewed and accepted the final slurry wall construction <br />report, including quality assurance test results; <br />3. Aggregate Industries will not expose ground water to the surface in Phases 1, 2, 3, or 3A <br />until a copy of a document from the State Engineer's Office proving that it is legal to do <br />so is provided to the DMG; <br />4. Aggregate Industries will not affect land within 200 feet of the Brantner Ditch, Brighton <br />Ditch, Kerr McGee oil and gas well pipelines and appurtenances or the Union Rural <br />Electric overhead power line and poles until a notarized agreement between the applicant <br />and the persons having an interest in the structure(s) that the applicant is to provide <br />compensation for any damage to the structure(s) or Aggregate Industries otherwise <br />complies with the requirements of Rule 6.4.19(b) or (c); and <br />5. Aggregate Industries shall not affect land south of and within 200 feet of the Todd Creek <br />Farms water supply pipeline and shall not further affect land within 200 feet of the north <br />side of the pipeline, in the Phase 2A area, except for reclamation work, until a notarized <br />agreement between Aggregate Industries and Todd Creek Farms stating that Aggregate <br />Industries is to provide compensation to Todd Creek Farms for any damage to the <br />pipeline, or Aggregate Industries otherwise complies with the requirements of Rule <br />6.4.19(b) or (c). <br />