Laserfiche WebLink
• Colorado Division of Minerals and Geolog~ <br />ESTIMATING FORM - BULLDOZER WRK <br />Tesk k: 5 Prep. by: RCO Task File Name; M131-5 <br />Date: 06/13/96 Permit p:M-79.131 Nine: Korinek S8G Pit <br />Permit Action: Final Reclamation <br />Task Description: Finish grading of replaced topsoil <br />HOURLY EDUI PMENT LOST <br />_____________________ Basic Machine: Cat D6H SERIES 11 Horsepower: 165 <br /> Blade Type: SEMI-UNIVERSAL --------- <br /> Attac hment p1: ROPS Lab Shift Basis: 1/tlay <br /> Attac hment d2: 3-shank ripper --------- <br />Cost Breakdown: <br />-------------- Utilization X <br />Ownership cos[/hr = 524.34 N/A <br />Operating 8 overhaul cos[/h r- dozer = EZ7.33 100 <br /> -ripper = E0.00 0 <br />Operator cost/hr = E22.95 N/A <br />Total egpt. unit cost/hr = E74.61 io[al fleet cost/hr: 574.61 <br />MA iER1AL OUAN7I ilES <br />___________________ <br />Initial <br />Swell <br />Loose <br />Vof une: 300.0 L CY Factor: N/A Volume: 300.0 LCY <br />Source of quantity take-off: Inspecti on measurements and permit file <br />Source of est. swell factor: program <br />________ <br />__________________________ <br />________ <br />_________ <br />HOURLY PRODUCTION <br />_________________ Job Condition Correc[~on Factors <br />Avg, push distance: 200 ft. ------------------------- ------- <br />- ------- - Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 1.20 (Cat tbl> <br />dozer production: 208 LCY/hr Dozing method..... 1.00 (gen.) <br />- -------- Visibili[Y..~~•~•- : 1-00 (avg,) <br />Material consistency: Job efficiency.... 0.83 (lsh/day) <br />Loose stockpile Spoil pile factor. 0.60 (fnd-sf) <br />--------------------- -------- -------- Push gradient..... 1.11 (Lat tbl) <br />Avg. push gradient: 5.00 X (neg) Altitude deration. 1.00 (Cat tbl) <br />- -------- Material wei qh [_.. 1.00 (Lat [bl) <br />Avg. site altitude: <br />_ 4230 <br />_--_-___ ft. Blade type........ <br />_________________________ 1.00 <br />_______ (S, SU,U) <br />Xat eri al weight 2300.00 lb/LCY Net Job Correction 0.50 <br />Mat. Dest r,: - -------- ---- ------- <br />GENERAL FILL Adjusted Unit Prod.: <br />__ lOG .04 <br />___ <br />_ LCY/hr <br />_____________________ ________ ________ <br />Adjus __ <br />ted Fleet Production: ___ <br />704.04 LLY/hr <br />JOB COST ---- ------- <br />Fleet size 1 Dozers) Total Job Time: <br />____ 2.88 <br />_______ Hours <br />- <br />Unit Cost __--_-- <br />E0.717 /LCY Total Job Cost: EZ 15. 15 <br />