Laserfiche WebLink
RULE 8.4.11 <br />E%HIB1T "L" <br />RECLAMATION COST <br />LEONE GRAVEL PIT #2 EXTENDED <br /> QTY. UNIT UNIT COST COST <br />1.) REVEGETATION SEEDING & PREP. 20 AC $225.00 $4,500 <br />la.) ESTIMATED FAILURE RATE 40% 8 AC $113.D0 $904 <br />2.) CHISEL (RIP) STOCKPIIE/PROCESS AREA 5 AC $120.00 $600 <br />3.) GRADE PIT FLOOR 5 AC $200.00 $1,000 <br />4.) BACKFILL OVERBURDEN FROM THE PIT WALLS & BERMS 8000 LCY $0.43 $3,424 <br />5.) SPREAD TOPSOIL FROM BERMS & STOCKPILES 8000 LCY $0.49 $3,912 <br />6.) MULCH 20 AC $25.00 $500 <br />7.) WEED CONTROL 20 AC $5.50 $170 <br />8.) MOB(DEMOB CAT D8N 1 LS $350.00 $350 <br />9.) MOBILIZATION & DEMOBILIZATION AL OTHER IMPLIMENTS &TRACTORS 1 LS $250.00 $250 <br />TOTAL DIRECT COST $15,610 <br />INDIRECT COST <br />PUBLIC LIABILITY INSURANCE 1.55% $242 <br />CONTRACTOR PERFORMANCE BOND COST 1.05% $164 <br />CONTRACTOR PROFIT 10.00% $1,561 <br />DIVISION OF MINERALS & GEOLOGY ADMIN. EXPENSE 5.00% $781 <br />ADDITIONAL SUPERVISION 4.00% $624 <br />ENGINEERING WORK 0.00°l0 $0 <br />DMG ADMIN. FEES 5.00% $781 <br />CONTINGENCY 2.00% $312 <br />TOTAL BOND AMOUNT #20,074 <br />R~C~EIvED <br />DEC 2 8 2006 <br />Division of Redamatlan, <br />Mining and Safety <br />