My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-12-28_PERMIT FILE - M2006085
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2006085
>
2006-12-28_PERMIT FILE - M2006085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 10:35:21 AM
Creation date
11/26/2007 2:14:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006085
IBM Index Class Name
Permit File
Doc Date
12/28/2006
Doc Name
112c application
From
Leone Sand and Gravel, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.1.9 - Topsoiling <br />(1) Topsoil will be stockpiledin close proximity to the mine areas in order to shorten haul distances <br />to and from the areas that were stripped. Once the topsoil has been removed and segregated from <br />the other spoil or product, it will be saved for replacement. If the duration before use exceeds one <br />full growingcycle, the topsoil stockpiles will be seeded with a westemwheatgrass to control erosion. <br />(2) Mining on the affected lands will disturb little to no woody vegetation. However, if any volumes <br />of woody vegetationaze produced,they will be properly placed in areas segregated from the topsoil <br />stockpiles and used in conjunction with the reclamation. <br />(3) Stockpiles will be configured to minimize erosion and will be located in azeas where disturbance <br />by ongoing mining operations will be minimized. As stated in 3.1.9 topsoiling (1) above, if <br />necessary, stockpiles will be seeded for the purpose of stabilization. <br />(4) It is planned to locate topsoil stockpiles so material will only have to be handled one time. No <br />relocation of topsoil is proposed. <br />(5) The operator will take measures to assure the stability of replaced topsoil on graded slopes by <br />roughing the subgrade to gain a mechanical bond to the topsoil being replaced. This should insure <br />the elimination of any slippage zones. <br />(6) It is the operator/applicant and landowners opinion that the topsoil present on site is adequate <br />to establish the seed mix recommended by the NRCS. No replacement topsoil is planned to be <br />imported for reclamation. <br />(7) Fertilization: As per NRCS recommendation. (Pounds actual available nutrient per acre <br />recommended) as follows: Nitrogen (Nz); 0, Phosphorus (PzOs): 0, Potassium (K): 0. <br />(8) Vegetative piles, if any, will be minimal and shall be removed from the area or utilized in the <br />reclamation of the mine site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.